PBYC Photo Gallery

P1000009

This space is now used partly for the downstairs HVAC, the second unit is installed up stairs. As of today we have water in the building and the plumbing inspection is complete.

Photo info

Popular tags

  • 1 photos are tagged with 4th
  • 1 photos are tagged with Building
  • 1 photos are tagged with Construction
  • 1 photos are tagged with July
  • 1 photos are tagged with of
  • 1 photos are tagged with parade

Random image